News date: September 29, 2015 The ring road for Suwałki will be joined to the Augustów ring road put into operation last year, which was also built by Budimex. The new road will be 12.8 km long and of the two roadway express road standard (S61, two roadways with two traffic lanes each). The ring road will... More